Scope
Traffic Control
License
Requirements
Practices/Processes
100

The scope of work includes installing a 4-foot retaining wall, which can be removed in 90 days 

What is a License Agreement?

100

This engineered document is required by the ROW before any construction or excavation can block a lane, sidewalk, or street in the public right-of-way.

What is a Traffic Control Plan?

100

An agreement that financially guarantees the principal will fulfill their obligations

What is a Bond?

100

Approval required for excavation over 300 LF

What is AULCC?

100

The TGS permit should be tied to this first if it is affiliated with the project

What is UC?

200

This type of official approval from DSD is required before you can install a new residential driveway.

What is a building permit?

200

A traffic control plan that combined Standard details 

What is an engineered TCP?

200

This document required a $500,000 General Liability

What is an insurance certificate?

200

Approval required for excavation related to a long-term project in the Downtown area

What is DAPCZ?

200

List of the Authorized Agents for the ROW Contractor

What is the Members Tab?

300

The scope of work requires the contractor to bore across the street.

What is Boring Plan and Profile?

300

A TCP includes pedestrian reroutes and barricades.

What is a sidewalk closure?

300

Must be notarized

What is the AAF?

300

Approval required for the utility work over 3000 sq.ft.

What is a General Permit

300

Primary or regular excavation permit requests

What is Priority 3?

400

 The approval is required for residential utility connections to municipal water and/or wastewater infrastructure.

What is a Tap Plan?

400

Details work scope, hours, and duration of the project.

What is the Barricading Summary Table?

400

The only other permit that requires a ROW license besides DS.

What is EX permit?

400

Approval for a large-scale non-residential private site development 

What is a Site Plan?

400

This group get a copy of all EX permits

What is Sitesubpermits@austintexas.gov?

500

This work scope requires the placement to be shown on the erosion and sedimentation plan.

What is a construction entrance?

500

This professional, licensed by the State of Texas, stamps and seals engineered TCPs for complex projects.

What is a Professional Engineer (P.E.)? 

500

The document identifies the person who can sign the bond on behalf of the principal

What is the Resolution of Authority?

500

Approval for a subdivision

What is a C8?

500

If a street interrupt is possible on the associated street segment. This field should ALWAYS be a “Yes”.

What is the Comments: Street Interrupt?