This person approves the installation of a 4-foot retaining wall, which can be removed in 90 days.
Who is Sam West?
This engineered document is required by the ROW before any construction or excavation can block a lane, sidewalk, or street in the public right-of-way.
What is a Traffic Control Plan?
An agreement that financially guarantees the principal will fulfill their obligations.
What is a Bond?
Attending this meeting is mandatory for excavation over 300 LF.
What is AULCC?
The TGS permit should be linked to this first, if it's associated with the project.
What is UC?
This type of approval is required before you can install a permanent structure in the ROW.
What is a License Agreement?
This is required when you are combining standard details to be used simultaneously.
What is an engineered TCP?
This document required a $500,000 General Liability.
What is an insurance certificate?
Attending this meeting is mandatory for excavation work related to a long-term project in the Downtown area.
What is DAPCZ?
This is where you can find the list of the authorized agents for the ROW contractor.
What is the Members Tab?
This type of approval is needed when the scope of work is minimal but requires the contractor to bore across the street.
What is a Boring Plan and Profile?
This TCP Standard allows for a maximum of 660 LF detour for pedestrians.
What is a sidewalk closure (804s-1 sheet 4)?
It'd be necessary to notarize unless you complete it in front of a ROW employee.
What is the AAF?
This approval is required for utility work exceeding 3000 square feet that has not been approved with a Site Plan.
What is a General Permit
This review process in the site plan is used to determine if the TCP was reviewed "in-process" or "out-of-process".
What is Traffic Control Review?
This approval is required for residential utility connections to municipal water and/or wastewater infrastructure.
What is a Tap Plan?
This ETCP requirement provides the details of the work scope, hours, and duration of the project.
What is the Barricading Summary Table?
The only other permit that requires a ROW license besides DS.
What is an EX permit?
This approval is for a large-scale non-residential private site development.
What is a Site Plan?
The contractor must submit their costs and quantities to the designated group.
What is SSI (site-sub inspection group)?
This type of work scope requires the placement to be shown on the erosion and sedimentation plan.
What is a construction entrance?
This is a pre-approved TCP that is designed by the city and must be sealed by an engineer.
What is a special detail?
The document identifies the individual authorized to sign the bond on behalf of the principal.
What is the Resolution of Authority?
This is an approval for a subdivision.
What is a C8?
During the extension, if the UC has expired and work has already begun, you need to get confirmation from this appropriate individual.
Who is the DSD Inspector?