QSAM Fundamentals
MARS Intake
QSAM Cards
Attributes & Scoring Guides
Maker vs. Checker
100

What does QSAM stand for?

Quality System and Monitoring

100
What is the very first step for any and all QSAM Maintenance tasks?

Receiving a MARS Intake item from requestor on the intake SharePoint.

100

What is the status of a brand-new card that has not yet been generated by the Checker?

Draft status

100

What type of attribute, named after regulations like ECOA or FCRA, requires extra accuracy?

Regulatory Attributes.

100

What role is responsible for the initial build or modification of a card or attribute in UAT?

The Maker.


200

The two main environments used for QSAM maintenance, one for testing and one for live changes.

Production and UAT.

200

What will pause the SLA clock on an intake item?

Having incomplete or missing information.
200

What type of card requires a PSR submission and developer involvement?

Non-3.0 Card.

200

What color is used to indicate all new or changed text when modifying a scoring guide?

Red font.


200

What role independently validates the work of the other before anything is generated or moved to the next step?

The Checker.


300
The location where all maintenance procedures and documentation are housed.

The MARS SharePoint


300

What is the standard Service Level Agreement (SLA) for a non-PSR request?

11 business days. 

300

What is the permanent identifier for a card that cannot be changed after creation?

The card name. 

300

What is the critical security step a Maker must take before sending a new scoring guide to a Checker?

Password protect with Restricted Editing.


300

What is the number of business days each role has to complete their part of the process in UAT?

5 Business Days. 

400

What are the three pillars of QSAM Maintenance Excellence?

Quality, Accuracy and Consistency


400

What document must be attached to the intake before any decommission work can begin?

The Decommission Approval email.

400

What date should never be altered when creating a new card or modifying an existing card?

The Effective End Date (12/31/9999)

400

 A Checker must perform this essential, simultaneous review of the intake, the drafted guide, and the published guide.

A Three-Way Review.
400

In a "True Fail" testing scenario, which role is responsible for correcting the identified issue.

The Maker.


500

Where are all scoring guides housed?

MARS Microsystems and Procedures SharePoint

500

What fields, including Status and Assignment, are managed exclusively by the MARS team and are not visible to requestors at the time of Intake?

The MARS-Only Tracking fields.

500

What is the five-step sequence for getting a new 3.0 card into the live production environment?

1. Build in UAT, 2. Checker validates in UAT, 3. Requestor tests in UAT, 4. Implement in Production, 5. Checker validates in Production

500

When decommissioning a scoring guide, it must be moved to the Archive folder in these two locations.

MARS SharePoint and the QSAM Maintenance Shared Drive.

500

Which role is ultimately responsible for clicking "Generate Draft" or "Generate Modification" in both UAT and Production?

The Checker.


M
e
n
u