I must be calibrated to ensure that my results are accurate.
What is Quality measuring equipment?
I am the tool used to determine if a person who does quality tests are competent to perform the test.
What is OWD (operational work diagnosos)?
I am the tool (paper or electronic) used to record the information captured from all PTS checks.
What is the data sheet?
I am used to determine when a problem solving must be initiated by frontline
What is a 5-whys trigger?
I am affixed to blocked product to communicate the status.
What is a blocking label?
If must be applied if to the equipment if it is not working properly.
What is an Out of Service label/sticker?
I am the location where the methodologies and reaction plans must be located for technicians and operators to access them.
What is the (OWS) Operator Work Station?
If I am out of the green zone then there is the potential for unsafe food.
What is a CCP (Critical Control Point)?
I am the technology tool used to capture 5-whys.
What is Problem Terminator?
I am the number of rules that exist for blocked product.
What is the number four?
The rules and guidelines that govern all areas where quality analytical testing is done.
I must include the safety hazards associated with performing any quality test.
What is the analytical standard or method?
I am the tool used to respond to any parameter that is not in the green zone.
What is the PTS reaction plan?
In the problem-solving relay, I am the tool selected to help monitor a process from shift to shift. When I am green its time to move on.
What is a dynamic PI?
I am the KPI used to measure how well blocking is applied.
What is blocking compliance?
I am a list of questions that must be asked to check if the results obtained are accurate and valid.
What are the verification rules?
What is three years?
I am triggered whenever there is non-conforming product generated.
What is the Blocking Procedure?
I am the problem-solving tool used to assess issues that are in the manage to sustain level.
What is the SDCA Cycle?
I am the time period within which full blocking must be completed.
What is by the following shift?
I must be labelled with my name, the date I was made, my expiry date and any hazards I have.
What is a chemical used for testing.
I am the tool used to assess the competence of person who perform analytical quality tests?
What is FAC (formative assessment checklist)?
I am the highest category of parameter within the PTS.
What is an RCI (Release Control Item)/ CCP (Critical Control Point)?
I am the second level of tool used if the same problem is recurring without resolution.
What is an abnormality report?
I must be assessed each month by the first or second week.
What is the MAZ Blocking Policy Checklist?