This is the AS9 panel from which you can cancel a PM
What is the M300 or Work Order Completion panel?
Because of its rapid response time and dual-fuel capability, this station often supports Ontario’s grid when renewable sources like wind or solar are not available
What is Lennox GS?
These are the 5 measures that feed into WMPI.
What are LTO PM, Crit-2 PM, Crit-2 CR, Backlog and Schedule Variance Index?
If a post-seismic or special surveillance check is required for dam safety, this is the work order type that shall be used (be specific!)
What is a non-credit PM?
eWP
What is Electronic Work Package?
To include a photo, specific instruction or reference material that is not an OPG controlled document in a work order package, a Planner should use this in AS9.
What is a Work Standard?
In 2018, this station was destroyed by a tornado?
What is Calabogie GS?
This is the # of ‘days grace’ that RG has to finish or cancel WOT before the reporting locks in.
What is 5 weekdays?
Prior to creating a new work request, this is the first step that an initiator should take.
What is determine if a WR already exists for the issue?
ORCP
What is Ontario Reliability Compliance Program?
When scheduling from the Schedule Workbench (WF-M210) WO backlog grid, performing this action will add schedule days to the WOT. If prior schedule dates exist on the task, they will not be removed.
What is Dispatch?
This is the oldest continuously operating hydroelectric station in the OPG fleet.
What is DeCew Falls?
The Schedule Variance Index evaluates how much unscheduled work disrupted the monthly schedule. To be considered unscheduled or “break-in” this field must be blank.
What is Schedule Start Date?
RG's work order task priority table (used to determine WOT priority codes) can be found in this procedure.
What is RG-PROC-MA-0002 Work Management - Assess, Plan and Schedule Work?
PMMR
What is Preventive Maintenance Modification Request?
Once a WO task is in Complete status, this is the number of days until it advances to Closed status
What is 90 Days?
This is one of 3 Northeast facilities currently undergoing redevelopment.
What are Stinson, Coniston or Matabitchuan?
LTO and Crit 2 PM compliance metrics use data from this BI report to evaluate compliance
What is Work Accomplishment?
If asked to create a new equipment tag, this is the governance a Planner should reference
RG-STD-MA-0002 Hydroelectric Equipment Asset Suite Nomenclature Standard
PEP
What is Program Execution Plan?
When implementing a PMMR to revise a PM, the PMMR ID# must be entered in this AS9 field for future reference.
What is AS9 D081 "Revision Comments"?
This Northwest dam is known for being one of the most remote sites in the province, accessible only by air or water.
What is Root River Control Dam?
(also acceptable: Lake St. Joseph Diversion Dam)
The Backlog Index Ratio compares the # of backlog tasks to the # of non-backlog tasks. This is the maximum ratio where teams will achieve 100%
What is 4:1 (backlog:non-backlog)?
This procedure defines the process for ensuring modifications to preventive maintenance predefines are reviewed and controlled to align with business imperatives.
RG-PROC-MA-0006 Preventive Maintenance Change Management
WGF
What is Water Gauge Failure?