Documents
Structural knowledge
Basics
Tools and Safety
WILD CARD
100

Is the one document that has to be signed before work can begin on a job. 

What is a Work Authorization 

100

This common building material becomes structurally weak once saturated. 

What is drywall? 

100

When you are assigned a new job, you look at these and then send what? 

What is look up on Dash Mobile to see notes and to click Engage to let customer know you are on the way. 

100

Technicians must wear this basic type of PPE when dealing with contaminated water.

What is gloves?

100

These images prove a loss, work done and the final results.

What are before, during and after photos? 

200

These 2 documents must be signed in order to get paid by State Farm Insurance and American Family. 

What is the Authorization to Pay (ATP) and Authorization to Repair (ATR)

200

This part of the structure often hides moisture and must be inspected carefully. 

What is the wall cavity? 


200

This classification refers to water that originates from a clean source and poses no immediate health risk.

What is Category 1 water?

200

This device pulls moisture out of the air during structural drying. 

What is a dehumidifier?


200

The dry standard for wood (WME)

What is  is between 10-12%

300

This document is required to be signed on all Nationwide Jobs so that the check can be sent to us. 

What is Nationwide ATP?

300

This type of floor covering traps moisture and often requires removal. 

What is laminate flooring? 

300

This document has to be signed by the customer before any contents can be disposed of. EVEN IF the adjuster said it is ok to toss them in trash. 

What is the contents disposal authorization 

300

This imaging tool helps identify hidden wet areas.

What is thermal imaging camera?

300

This must be shut off before entering a heavily flooded area.

What is electricity? 

400

Must be signed if we are not going to be able to do daily monitoring on equipment. 

What is the Missed Monitoring document?
400

My house was built before 1979 so i need to have this testing before demo begins. 

What is Asbestos testing? 

400

The first critical step after arriving on a water loss.

What is cause of loss - ensure source has been stopped?

400

Should be completed daily by each Lead Tech to ensure trucks are properly stocked and ready for jobs. 

What is the Vehicle Inspection Log?

400

The standard that addresses mold remediation. 

What is the IICRC S520

500

This carrier has a specific Welcome letter and 2 page COS/AOS that both need to be signed. 

Who is USAA? 


500

These hidden spaces between floors often require specialized drying.

What are joist bays? 

500

This term in the IICRC S500 defines the state when the building materials have reached acceptable moisture levels and can be considered officially dry. 

What is Dry Standard? 

500

This document outlines drying goal, equipment usage and monitoring results.

What is the Drying Plan (Mitigate is also acceptable)

500

What does the tempeture and humidity together give you when taking moisture readings? 

What is GPP (Grains per pound) ?

M
e
n
u