These locks are personal locks used by all contractors and are used to indicate the individual who is working on the equipment is a contractor
What are purple locks
This tag is called a Lock, Tag & Try LOTO Permit
What is a green tag
Step 1 in the 9 step LOTOTO process
What is identify the energy sources
The acronym SAM stands for
What is Safe Access to Machinery
The year the Oland family bought this property on Agricola Street
What is 1905
This lock is affixed to the energy source in a single-point isolation or on a hasp or a lock box as a part of a multi-source isolation. Each employee is issued one.
What is a Blue lock
The Lock, Tag & Try LOTO Permit must be completed by _____________ coordinating the LOTO of a piece of equipment.
Who is the authorized person
Step 7 in the LOTOTO process. Often referred to as the most important step. This is the last step before entering the machine to service.
What is the "try" step. Ensure that the machine won't power up after it has been locked out.
In order for a SAM to replace a LOTOTO the work must be
What is a minor servicing adjustment
The year in which the Oland family purchased Alexander Keiths
What is 1928
These locks are used in the field to secure single lockout points during multi-LOTO activities. Authorized personnel install these locks, and they are accompanied by red and white Danger Tags on each lock
What is a red lock
The manager checks the green tag for accuracy and retains it for this many days before turning it into the safety office.
What is 30 days
Step 9 in the LOTOTO 9 step process
What is the release from LOTOTO. Make sure all tools have been removed from machine, clean any resulting mess, undo the locks and restore the machine to service. Be sure to notify all parties that the LOTOTO is complete.
To be considered a minor service adjustment the work must be _________. Which means it occurs during normal run cycles.
What is routine
The year in which Labatt purchased Olands
What is 1971. For a reported 12 million dollars
These are the only locks that can have common keys
What are yellow locks
The completed permits are placed on the lock on the single source or ____________, where it is visible and available to other employees who may be attaching locks.
Where is on the Lock Box
Step 2 in the LOTOTO process. This step is all about communication and collaboration.
What is the notification step. Notify all affected parties that a LOTOTO is about to take place so they can anticipate downtime
To be considered a minor tool adjustment the work must be __________. Which means it occurs regularly as part of production
What is repetitive.
The year the Oland family built the Bluenose II
What is 1963
These locks are required for multiple-point LOTO with more than one person involved in the LOTO. They are also required whenever a “change in control” of a LOTO activity occurs or is expected
What are Green locks
The only type of lockout that doesn't require a green tag
What is a confined space entry. The confined space permit has LOTOTO requirements built into it and therefore doesn't require the use of a green tag.
Step 6 in the process. This step takes place immediately after the physical lockout is done.
What is releasing the stored energy.
In order to conduct a SAM you must initiate the following
What is an E-stop and a secondary safety device (disconnect, etc)
When Schooner was produced for the first time