Weather Emergencies
Safety Potpourri
100

Responsible for Hurricane Plan activation and following the sequence of the Hurricane Plan Phases.

What is Seadrift's Management Team

SP-210-500


100
Seadrift program encouraging employee participation and engagement in the HS&EP program

What is the Safety Credit Program.

200

Non-essential personnel are responsible for completing their tasks associated with their area's what?

What is Hurricane Checklist

SP-210-500

200

The count of Seadrift's Cardinal Rules

What is 7

SPL105

300

Group responsible for reporting to the site at the scheduled time and assist in finalizing Plant preparations and shutdown, monitor's equipment operating during hurricane, and initial damage assessment.

What is Hurricane Team

(SP-210-500)

300

Documentation required to use mobile phone in process areas.

what is written approval and Hot Work Permit

SPL112, section 4.2 and Appendix A

400

Seadrift's Shelter in place buildings.

What are Admin (main hallway), Coker Control Room, Maintenance office building (lunch room), and Permit Bldgs.

SP-210-100

400

Maximum allowable air pressure used when blowing dust, metal shaving or dirt from your clothes.

What is ZERO, air hoses are not for cleaning clothing
500

The wind speed where Operations announces the upgrade from safety glasses to goggles.

What is ≥30 MPH

SP-210-100

500

the Admin Building 2nd alternate muster point

Contractor Parking Lot

SP-200-020

M
e
n
u