EHS Safety Briefing
Intro to SWBDs
Quality
Flow Lines
Blueprints
100

What PPE must be worn at all times when on the plant floor, even during breaks/lunch?

Safety Glasses, Vest and Shoes

100

A single unit/cabinet is referred to as a   ________.

Section

100

What do you think can happen if we do not follow our quality procedures?  Please select all that apply.

A.It can cause an arc flash and potentially an explosion.

B.It can cause the unit to not work properly.

C.It can lead to customer complaints.

D.Nothing, we can continue with production.

A.It can cause an arc flash and potentially an explosion.

B.It can cause the unit to not work properly.

C.It can lead to customer complaints.

100

After gathering bus and kit parts, engineering drawings, and BOMs, what do you do next?

Assemble frame/sections based on engineering drawings

100

What is the name of the program we use to pull up Blueprints?

Electronica

200

A JHA (job hazard analysis) identifies the dangers of a specific task in order to reduce what?

Reduce the risk of injury to workers

200
Multiple sections make a __________. 

Line Up

200
What are the 3 ISO (International Organization for Standardization) standards that we follow?

Quality

Health & Safety

Environmental

200

When section assembly is completed, where do you send the section?

Wiring Area

200

Which view tells you how tall the section is?

Front View

300

A _____ is an incident that, given a slight shift in circumstance, would have caused an injury, major property damage, or an environmental impact.  Also known as “close calls”.

Near Miss
300

What does the Main/Service section do?

Monitors and controls the incoming power

300

Define the term calibrated tool. (Not an example of one)

A device, that when used,  provides a value or applies a force.

300

When the wiring is complete, where do you send the section?

Test Area

300

Which view do you use to determine how deep a section is?

Top View

400

To use a fire extinguisher, use the acronym PASS.  What do the letters PASS stand for?

P ull the pin

A im at the base of the fire

S queeze the lever

S weep side to side

400

What does the distribution section do?

divides and distributes the power

400

What do you do if a part is lost, damaged, manufactured incorrectly, or doesn't match the drawing?

Complete an NCR form.

400

When testing is complete, it goes to closing.  When closing is complete, where do you send the section?

Green Tag

400

This is a parts list and gives the description of each part, quantities, as well as a specific part number.  Parts will reference back to the engineering drawings.

BOM

500

Per our Quality, Environment, and Health and Safety Policy, what does the P in “COPS” stand for?

Prevent defects, pollution, and injury to health.

500

What does the vertical bus do?

carries power to and from all the breakers

500

What do you do when the job design isn't correct and usually requires an engineering review?

Complete an OEPR.

500

When Green Tag is complete, where do you send the section to?

Shipping

500

Main drawings/assemblies can be broken down into _____________, so that you can drill down at look at specific build instructions.

sub-assemblies

M
e
n
u