Mobile
WIB
Lead list
Goal / Expectation
All Spectrum
100

Who are the current mobile top sellers for July? 

Stephens,Jeff Howard

Sanchez,Salvador


100

How many Sims cards are in the WIB modem?  

Two SIMS cards - Verizon & AT&T.

100

How many days do you own your ZIP+2s?  

90 days (3 months).

100

What are AE's Mobile Expectations/ Goals?

•Sell 4 Mobiles per Month

•Connect 2 Mobiles per Month

•SOP 1 Mobile per Month

100

What team has the record for most mobile sale in a month

Team GHD / Garibay  34 Mobiles 

200


Spectrum carries how many mobile plans? 

3 - by the gig, unlimited, unlimited plus.

200

Wireless Internet Backup will automatically provide Internet to up to _____ mission critical devices in the event of a network or power outage?

4 devices.

200

A lead list PSU is paid at $_______ (Under 20 PSU’s installed)  

$100.00

200

What are AE's Project Expectations/ Goals?


Sell 1+ Project per Month

200

What does ECCR stand for?  

Existing Customer Construction Required.

300

Unlimited: After a line uses 20GB of data it will experience speeds reduced to ____ Mbps download and _______ upload for the rest of the bill cycle and data traffic will be de-prioritized behind the data traffic of other customers during times of network congestion for the rest of the bill cycle.   

1 Mbps download and 512 Kbps upload

300

When installing the Cradlepoint LTE Modem -the SIM card with the weaker signal will _______?

deactivate

300

How many ways can you dispute lead list?

  Multisite, incorrect ZIP, adjacent.

300

What are AE's install Expectations/ Goals?

•Connect 30+ PSUs per Month With 8 LLs

300

SPECTRUM BUSINESS VOICE offers ____ business phone features

35+

400

Unlimited plans include up to _______mobile hotspot use per line during a billing cycle, with speeds reduced down to a maximum of 600 Kbps for mobile hotspot use after 5 GB for the rest of the billing cycle for that line.  

5 GB

400

WIB installations will be routed to ___________? 

A Spectrum Field Technician

400

Mobile service must be sold _________ calendars days from the date of the core service (internet) was entered to count as lead list Bundle? 

5

400

What are AE's Signed Expectations/ Goals?

•Sell 42 PSUs per Month With 10 LLs

400

Spectrum Business Internet Ultra +Spectrum WiFi +Business WiFi + Spectrum Business Voice (3) Phone Line + Spectrum Business TV Essentials+ (2)  Apple TV 4K 32GB Total Cost $_________

Order Total*$182.94

500

What 2 things are required for Spectrum Mobile? 

Spectrum Internet required, Auto-pay required

500

What equipment will be installed for a WIB order? 

WIB Cradlepoint 1650 LTE Modem, External LTE antenna, Battery backup

500

AE Earnings. AE has fourteen (14) core PSU connects and four (4) mobile PSU connects for a total of eighteen (18) PSU connects, meeting the minimum threshold, but not the PSU target of 30 PSUs. AE had two (2) Lead List Bundles equaling four (4) Lead List PSU connects, and four (4) total additional mobile lines. Of the eighteen (18) total PSU Connects, fourteen (14) were non-Lead List and four (4) PSUs were from Lead List. The AE connected Four (4) additional mobile lines. AE commission earnings is $______?    

$1,155 + $400 + $200 = $1,755. (14 x $82.50 per PSU is $1,155) + (4 x $100 is $400 per PSU)+ (4 x $50 per additional line is $200)

500

Name an AE that has hit goal already for July (Under Nancy leadership)

Nahapetian,Alex  - 41 installed

Sanchez,Salvador - 30 installed

500

How many different types of construction are there?

7 - single site, multi-site, multi-tenant, brown field, green field, 8K exception and ECCR.

M
e
n
u