Scrum
What is Daily Stand-Up?
This gets the state of New.
What is the Feature is not ready for team review?
This is now called PI Planning
What is Big Room Planning?
This is something Backlog Grooming and Iteration Planning have in common.
What is they are both 2 - 4 hours per iteration?
Or
What is the whole team is involved?
Or
???
What is the spaghetti looking chart we used in Iteration 2 and 3?
This is now called an Iteration
What is a Sprint?
Team has the feature broken up into defined user stories
What is Decomposed?
This is the level of the Work being done during PI Planning
What is the Feature/Story Level?
Releases vs Planning Increments
What is Releases are scheduled pushes to production and Planning Increments are plans for a set of Iterations.
These were once called Team Leads
What are Directors?
This is Accepted
What is all user stories on a feature are accepted?
This is the duration
What is 2 days?
How we use to do Backlog Grooming vs how we do it now.
Discuss
Iteration Planning
What was Sprint Planning?
This state means that the PO/Team have reviewed the feature and agreed on the description, acceptance criteria, and t-shirt size
What is Groomed?
This is what we need to have at the before PI Planning starts
What are Features prioritized and Features marked as "Groomed"?
Static vs Dynamic
What is staying the same vs changing?
Formerly known as Testers
What are team members?
This state means all user stories on this feature are in an integration/regression environment.
What is Release Candidate?
DOUBLE JEOPARDY!
These are the 7 Exit Criteria for PI Planning (must be completed by the end of PI Planning)
Feature Story and Acceptance Criteria is finalized
Feature decomposed into Stories
Stories have been assigned points
Feature Preliminary Estimates align to Points
Features and Stories are roughly sequenced by iterations to determine dependencies and compare against iteration capacities
Features are marked as “Decomposed”
Features to be planned in PI have concurrence from the Team and PO(s)