To build a housing development in Boone, who is typically responsible for building sidewalk/s?
Project General Contractors
The project design team suggests placing the solar panels like a parking shade, what LEED score they can claim for
Heat Island Effect
What building division will be calculated in the indirect cost?
General Requirements
What animal sleeps %90 of its life?
Koala bear
Who would request a change order?
Owner
How many hearts does an octopus have?
three
What is the maximum width of the modular boxes for road transportation without any oversize permit fee?
[on the east coast]
16 feet
According to your project cash flow in which month in your project you had the highest cost estimation?
XX
How many waiting days are recommended by civil engineers for concrete curing before the installation of modular boxes on the top of the foundation?
28 days
This country has no mosquito
Icland
What source you can use to determine the Building Permit for your project in the feasibility phase?
Schedule of Permits/ Permit Schedule by Planning and Inspection Department
The lumber size for the ceiling joists for the volumetric modular boxes can be as low as BLANK
2 x6
Which one is the most profitable markup indirect percentage rate?
35 45 25
45
What percentage (in range) of a conventional project schedule you may reduce by offsite techniques
20 to 60
What is the main reason to write the Ethical Dilemma to the Owner?
Provide in the written document stating that they are faithful to the agreement's terms and conditions
Front door and back door analyses are useful to determine BLANK and BLANK respectively
How much of income you need to generate
How much of the building cost you can afford
Adding bicycle racks to the project design will help with what category in LEED
Location and Transportation
Name two sets of data in the Cash Flow diagram
Monthly Cost
Cumulative Cost
What activities can be executed on-site while the modular units are being constructed in the factory?
Site preparation
Foundation
Final Payment is equal to BLANK and is being paid after BLANK
Retainage
Completion
Housing and Urban Development (HUD) recently provided a policy where the single-family R1 lots with an existing ADU can be qualified for FHA by adding equity to their loan application. How does that help in getting a construction loan for your project?
Name four requirements to place in the site utilization plan
Safety box Fences Lot boundary/line Parkings Loading area etc
In a modular design build project, what cost item can comes with savings
Savings :number of days for renting euqipments on site for example renting GC trailer for General Condition/Requirements
In the Line of Credit Graph which of the graphs shows a higher value
Cumulative Cost OR Cumulative Payment
Cumulative Cost
Any day receiving BLANK of rain or greater is classified as a weather delay day.
0.5 inches