This is the purpose of the CQM program is to achieve the quality establish by what.
What the contract requirements?
This type of drawing provides information to manufacture a machine part or erect a structure.
What is working?
Military construction (MILCON) is programmed for funding via this published document.
What is Project Objective Memorandum (POM)?
This is the number of calendar days the construction unit has to notify the QA authority if any changes are made to the QC plan.
What is 7 days?
This is a goal set during the pre-planning conference.
What is identify assumptions and limitations?
The QC Manager implements and manages the QC System and is directly responsible to whom.
Who is the commanding officer?
This type of plan shows contours, boundaries, roads, utilities, trees, structures, references, and any other significant physical features.
What is Site Plan?
These individuals conducts the constructability review for each assigned project.
Who is Project/Construction managers?
This document clearly delineates the function and responsibilities of the team members.
What is project quality assurance plan?
This individual conducts a pre-planning conference with the project team to set goals for accomplishing the planning tasks.
Who is the Project Manager?
When it comes to noncompliance, the primary focus of the QC System is what.
What is prevention?
This is the location where the revision block will appear on the blueprints.
What is upper right corner?
These are the two broad categories of task organization the Naval Construction Force(NCF) uses for mission accomplishments.
What is general engineering and defensive operations and tactics?
This organization performs the QA function when supporting Navy installations.
Who is Facilities engineering and acquisition divison (FEAD)?
This element is responsible for the quality, safety, and timeliness of the construction effort and for directing the support elements.
What is the Lead element?
This is known as the backbone of the QC System.
What is the Three Phases of Control?
This type of drawing reflects minor changes or field adjustments made to official contract drawings while in the field during construction.
What is Red-line drawings?
Seabee project managers need to be familiar with funding appropriations as it relates to what two items.
What is project funding threshold/timing limits?
These individuals prepare an individual project safety plan and submits it to the Safety Officer for review and approval prior to work starting on the project.
Who is project supervisor and crew leaders?
This individual is responsible for conduction the periodic Quality Control meetings.
Who is the Unit Quality Control Manager?
This document is developed by the designer and maintained by the project crew leader, list all required material submittals.
What is project submittal register?
This document is used to supplement the drawings when an aspect of construction cannot be shown graphically.
What is Specifications?
This document is used to record conditions and decisions reached between to NCF units.
What is Turnover Memorandum Worksheet?
This document must be included in the project safety plan.
What is List of definable features of work (DFOW)?
This phase(s) of the Three Phases of Control involve(s) reviewing the safety plan.
What is the Initial Phase?