CO'S STANDING ORDERS
8010
REFERRENCES (EOSS, TUMS, NSTMS)
CHENGS STANDING ORDERS
CHENGS STANDING ORDERS CONTINUED
100

IAW WITH CO STANDING ORDER NO. 5, WHAT VOLTAGE DO YOU NEED COS PERMISSION TO WORK ON EQUIPMENT OR ENERGIZED CIRCUITS?

30 +

100

QUICK DISCONNECT FITTINGS (QDF) SHALL BE LOCATED WITHIN HOW MANY FEET OF DESIGNATED VERTICAL/HORIZONTAL FIRE ZONE BOUNDARIES?

10 FT

100

WHICH PUBLICATION GOVERNS DAMAGE CONTROL AND ENGINEERING CASUALTY CONTROL?

NSTM 079 VOL 3

100

UPON CHECKING INTO THE USS CHIEF ENGINEERING DEPARTMENT, WHAT ARE THE REQUIRED READING MATERIALS TO BE COMPLETED WITHIN 2 MONTHS? 

EUG

TUMS

EDORM

100

HOW OFTEN ARE ENGINEERING ASA REVIEWS CONDUCTED? AND WHO IS RESPONSIBLE FOR THE OVERSIGHT OF THESE REVIEWS?

QUARTERLY

CHIEF ENGINEER

200

IAW CO STANDING ORDER NO. 10, WHAT AT A MINIMUM DOES THE CO WANT TO BE ONLINE DURING RMD?

1 ENGINE PER SHAFT

1 GENERATOR PER SWITCHBOARD

200

HOW LONG MUST A TANK OR VOID BE VENTILATED PRIOR TO PERSONNEL ENTRY?

24 HOURS

200

WHAT ARE THE SIX CHAPTERS OF THE EOSS USERS GUIDE? (EUG)

INTRODUCTION


ENGINEERING OPERATIONAL PROCEDURES (EOP)


ENGINEERING OPERATIONAL CASUALTY CONTROL (EOCC)


COMMUNICATIONS


LEARNING TO USE EOSS


EOSS FEEDBACK SYSTEM

200

WHAT ARE THE 5 CHENG PERMISSION ITEMS IAW CHENG STANDING ORDER NO. 2?

TAGGING OUT STEERING OR ANY SYSTEM AFFECTING STEERING AFTER COMPLETION IAW MLOC.

TAGGING OUT MAJOR SYSTEMS WITHIN 24 HOURS OF UW (MPDE,SSDG, MPAC, MRG, CPP, AC, REEFER, MMGTG, FIREPUMP, MAIN SECONDARY DRAINAGE, RO, POTABLE WATER PUMPS, ASW PUMPS, L/O POLISHER, F/O PURIFIER, INSTALLED FF, DECK EQUIPMENT)

OPERATE ANY EQUIPMENT WITH OOC INSTRUMENTS

GIVING ANY TOOLS, PARTS, MATERIALS OR TEST EQUIPMENT TO OTHER SHIPS

USING DC EQUIPMENT FOR ANYTHING OTHER THAN DC

200

IAW CHENGS STANDING ORDER NO. 6, WHILE OPERATING AT TRI POWER, WHAT IS THE MAX SPEED AVAILABLE FOR A SINGLE ENGINE SHAFT?

AHEAD 6

300

WHILE COMBATTING A FIRE/FLOODING/TOXIC GAS/HAZMAT SPILL DURING RMD, CO'S PERMISSION IS REQUIRED TO ELECTRICALLY/MECHANICALLY ISOLATE WHAT?

ANY EQUIPMENT OR SYSTEMS AFFECTING PROPULSION, STEERING, OR NAVIGATION.

300

WHAT ARE THE TWO CRITERIA THAT HAVE TO BE MET FOR WORK TO BE CONSIDERED "HOT WORK" AND WHOS PERMISSION DO YOU NEED TO START COMMENCING HOT WORK DURING AN INDUSTRIAL ENVIRONMENT?

MUST PRODUCE A SPARK

EXCEED 400 DEGREES F

NEED PERMISSION FROM THE FSC

300

HOW OFTEN IS THE EOSS PROGRAM UPDATED?

EVERY 6 MONTHS

300

IAW CHENGS STANDING ORDER NO. 3 WHAT STANDARD ABBREVIATION IS SCFM? 

STANDARD CUBIC FEET PER MINUTE

300

IAW CHENG'S STANDING ORDER NO. 7, WHO MAKES UP THE CASUALTY RESPONSE TEAM?

OIL KING


SOUNDING AND SECURITY

400

WHAT ARE THE ONLY EXCEPTIONS FOR SETTING MAX PLANT RELIABILITY?

WHEN THE SHIP IS WITHIN A MINEFIELD 

DURING MAIN SPACE FIRE/MAJOR FUEL OIL LEAK

400

WHAT 3 THINGS NEED TO BE PRESENT FOR A SPACE TO BE DEEMED IDLH? WHO'S PERMISSION DO WE NEED TO ENTER A IDLH SPACE?

FLAMMABLE VAPORS @ 10% OR HIGHER OF LOWER EXPLOSIVE LIMIT (LEL)

OXYGEN CONTENT LESS THAN 19.5% BY VOLUME OF GREATER THAN 22% BY VOLUME

PRESENCE OF TOXICANTS ABOVE NIOSH PRESCRIBED IDLH LIMITS

NEED CO'S PERMISSION

400

WHAT ARE THE 6 SECTIONS OF THE TAG OUT PROGRAM?

INSTRUCTIONS

ACTIVE LINE ITEM RECOR SHEETS

ACTIVE TAGS TO BE HUNG

CLEARED

INSTRUMENT LOG

RECORD OF AUDITS


400

IAW CHENGS STANDING ORDER NO. 6 WHAT ARE THE 4 SPECIAL PLANT CONFIGURATIONS?

TRAIL SHAFT

OPERATING WITH BRAKED/LOCKED SHAFT

TRI POWER (2&1 ENGINE COMBINATION)

MMGTG OPERATIONS

400

WHILE OPERATING ON SHIPS POWER, DURING A LOSS OF POWER EOOW/EDO WILL RESTORE SYSTEMS IN WHAT ORDER?

FIREMAIN

ASW

CHILL WATER

400 HZ

MPAC

REEFER

OTHER SYSTEMS AND EQUIPMENT DEEMED NECESSARY BY THE CO OR CHENG

500

IAW CO STANDING ORDER NO. 11 THE EOOW SHALL ENSURE THAT THE FOLLOWING EQUIPMENT IS PLACED IN OPERATION.

4 MPDES ONLINE/CLUTCHED IN

2 SSDGS ONLINE AND PARALLELED (3RD SSDG RUNNING OFFLINE)

1 ASW

2 MPACS

PORT/STBD MRG STBY PUMPS

PORT/STBD CPP PUMPS

MMGTG

1 AC

1 REEFER

2 FIRE PUMPS

ANCHOR WINDLASS AVAILABLE

HPUS AVAILABLE

BOW THRUSTER

F/O SERVICE SYSTEM

500
WHO MAKES UP THE FIRE SAFETY COUNCIL?

FIRE SAFETY OFFICER (CHAIRMAN)

SHIP SUP

RMC REPRESENTATIVE

COMMISSIONED OFFICER AS DESIGNATED BY CO (DCO/DCA)

ENGINEERING PLANNING DEPARTMENT REPRESENTATIVE

PROJECT SUPPORT ENGINEER (ONLY IF NO ONE FROM ENGINEERING PLANNING DEPT IS AVAILABLE)

OTHER COGNIZANT PERSONNEL



500

IAW NSTM 262 WHAT TEST MUST BE CONDUCTED BY THE OIL KING UPON RECIEPT AND PRIOR TO STRIKING DOWN 9250 OR 15W-40 OIL TO THE STORAGE TANKS.

VISCOSITY

500

NAME ALL 16 OF CHENGS STANDING ORDERS IN ORDER

1.) GOOD PRACTICES/GENERAL GUIDANCE TO THE WATCH.

2.) REQUIRED PERMISSION/NOTIFICATION ITEMS

3.) STANDARD ABBREVIATIONS

4.) ENGINEERING LOGS AND RECORDS

5.) PHYSICAL SECURITY AND REQUIRED LOCKS

6.) SPECIAL PLANT CONFIGURATIONS

7.) CRT COMPOSITION AND PROCEDURES

8.) RESTORE FROM LOSS OF POWER

9.) MODIFICATIONS TO EOSS

10.) EOOW/EDO RELATION TO CDO/OOD(U/W)

11.) GROUND CHECK/GROUND ISOLATION POLICY

12.) RECALL PROCEDURES AND SHORT NOTICE LIGHT OFF

13.) USE OF BATTLE OVERRIDE

14.) CARE OF NEW L/O

15.) FSW REQUIREMENTS

16.) REQUIRED READINGS ON WATCH

500

WHO CERTIFIES THE OIL POLLUTION ABATEMENT EQUIPMENT ONBOARD AND HOW OFTEN IS IT REQUIRED? 

ARE EXTENSIONS PERMITTED? IF SO FOR WHAT TIME FRAME AND HOW MANY CONSECUTIVE EXTENSION ARE ALLOWED?

COMMANDER NAVAL SEA SYSTEMS COMMAND

5 YEARS

6 MONTH EXTENSION PERMITTED NOT TO EXCEED 2 CONSECUTIVE EXTENSTIONS (12 MONTHS)

M
e
n
u