Spicy Dirt
What's the Plan
Strike 3
Don't Cross Me
What's Your Sign
100

A person should move this many feet away to avoid step potential.

What is 10 meters or 33 feet?

100

This dirt structure increases the cover over utility lines.

What is a blister or berm?

100

In 2016, utility strikes cost this amount in property damage. 

What is 1.7 billion dollars?

100

At proposed crossing locations, Hydro-Vac must be used at what intervals.

What is 10 feet?

100

Overhead signs shall include stickers with this minimum letter height. 

What is 3 inches?

200

Gas and oil utility lines are marked by this color.

What is Yellow?

200

How many days ahead does a One-Call need to be made?

2-3 business days

200

This piece of equipment is responsible for the most utility strikes.

What is a backhoe?

200

This many feet of overhead utility clearance is required above moving equipment if the voltage is under 50,000

What is 4 feet?

200

What two things are not allowed within 24" of a daylighted cable when excavating?

Hand-held power tools or mechanical excavators

300

On a wind site, the use of any hand-held power tool or excavator is prohibited within this many feet of an underground utility locate. 

What is 2?

300

The Uniform Color Code green marks these utilities.

What are sewer and storm drains?
300

This is the #1 cause of utility strikes.

What is failure to locate?

300

This call must be made before any subsurface penetration or sign installation can be done. 

What is a "One-Call"?


300

Overhead power line signage is required to have this many flags attached to them. 

What is 2?

400
The maximum voltage for the use of measuring stick is this number.

What is 25 kV?

400

DAILY DOUBLE: This appendix has pipeline crossing information. 

What is E?

400

If a piece of equipment strikes an overhead powerline, barricades should be placed at this interval. 

What is 50 feet?
400

Metal t-posts need to be installed in areas where this potential hazard is present. 

What is livestock?

400

This color is used to mark storm and sewer drains. 

What is green?

500

In the event of an underground utility strike, this person is responsible for securing the scene. 

Who is the Foreperson?

500

This appendix must be used in the event of an underground or above ground utility strike. 

What is G?

500

This appendix is where you go for equipment dimensions and weight spec tables.

What is D?

500

Hydro Excavation water pressure can reach this many PSI. 

What is 1,700?

500

Guard structures are required at all solar overhead line crossings that are up to what height?

What is 50 feet?

M
e
n
u