Paint Experts
Small Jobs
Admin & Processes
GUT/WW
Grab Bag
100

The two areas that we tend to see paint failures first.

What are horizontal surfaces and trim?

100

The base small job fee applied to small jobs as a starting point.

What is $270?

100

The timeframe in which estimates should be sent to homeowners.

What is within 24 hours?

100

The length Hardie board plank siding is commonly sold in.

What is 12 ft?

100

The length in years of Vivax's warranty options in Colorado.

What is 3, 6, 9 and 14 years?
200

The product applied to brick before painting when it has not been painted previously.

What is block filler primer?

200

The brand and product we recommend for new, unstained wood decks/pergolas/fences.

What is Guiry's oil-based transparent stain?

200

This must be completed when a homeowner wants to change the accent color as a small job.

What is the Color Release Form?

200

The number of outlets required for a gutter bid with 6 downspouts.

What is 6 outlets?

200

Vivax's core values.

What are Enthusiasm, Pride, Perfection, Ownership, and Integrity?

300

The process by which water soluble components of the paint separate and rise to the surface, appearing as streaked, discolored areas.

What is surfactant leaching?

300

The cost per linear foot of railing to apply Deck & Dock to a railing in bad shape.

What is $12 per linear foot?

300

The 3 things we must discuss with the homeowner at the end of an initial walkthrough.

What are...

1. Confirm if they have paint

2. Confirm contact info

3. Mention reviews when the project is complete

300

These boards must also be replaced in most cases when replacing cottage lap siding and panel siding.

What are trim boards?

300

The distance from which 3M plastic must extend when working on a lead positive home.

What is at least 10 ft?

400

The component in Duration paint that gives it a higher color retention.

What is a higher level of titanium?

400

The price to the homeowner for us to prime and paint 5 new sets of shutters.

What is $1,120?

400

The percentages of net profits you get credit for based on the days since collection

What are...

  • 0-7 days since collection: 100% 

  • 8-14 days: 75% 

  • 15-21 days: 50% 

  • 22+ days: 0% 

400

The process for installing a fascia board under a stone tile/stone coated steel tile roof.

What is the roofer must uninstall/reinstall the roof tiles?

400

These are the department heads for Denver.

What are...

Coleman Harris - Head of Production

Kayla Farber - Head of Sales

Jamie Nershi - Director of Warranty

Scott Bondy - Director of Marketing

Chelsea Teston - Director of Coordination

500

After posting the lead certificate, notifying neighbors, and placing caution tape and plastic, these are the prep steps for warranty work on a lead positive home.

What are...

1. Provide crew with suits/masks/gloves

2. Scrape one side of home

3. Wipe down with rags

4. Caulk and prime

5. Clean up with HEPA vac and goose neck trash bags

500

The amount this homeowner received for painting the front side following hail damage. 

What is $1,160.36?

500

The 9th component of the Warranty Manager SMaC recipe.

What is... "I take pride in completing my administrative duties to support clean processes within the department. Friday is my opportunity to make sure my crews are paid, jobs are closed, make sure paid jobs are collected, and send updates on any open jobs to my manager"?

500

The number of linear feet of siding needed to replace all laps on the gable from the red line up (7 laps),  the bottom lap measuring 30'.  

What is 138' linear ft of siding?

500

The number of gallons of product Vivax purchased from Sherwin Williams in 2025.

What is ~114,000 gallons?

M
e
n
u