What is the FLBM completion target for 2018?
a.100% b.90% c.85% d.95%
A. 100%
When was Oloma Remembrance Day
a) Nov 12
b) Nov 20
c) Nov 22
c) Nov 22
SPDC's 2018 Fit for the Future ambition is described in 3 numbers. What are the numbers?
“1-0-1”
Shell is the operator of a Joint Venture agreement involving NNPC, Total, Agip and Chevron. True OR False.
False
What is the full meaning of the abbreviation - AIPSM? a. Asset Integrity & Process Safety Management b. Asset Integrity & Process Standard Management
a. Asset Integrity Process Safety Management
The OER has ________ Game Changer Themes
a) 7,
b) 5
c) 6
d) 3
A) 7
Mention the 3 HSE golden rules.
Compliance, Intervention, Respect our neighbours
Which of the following is NOT a LEAN tool?
a. 5s
b. Kanban
c. Kimshi
d. Kaizen
c. Kimshi
E&C - If I'm invited to speak at a conference on a topic related to my work at Shell. There is no E&C issue if I request for travel allowance, payment or gifts from the organisers.
TRUE / FALSE
FALSE
In general, external speaking opportunities should be work-related and bring mutual benefits to Shell as well as the organiser. Speaking opportunities should therefore be considered as part of your role and Shell should take up all costs, including travel and accommodation.
Process safety starts when?
a. At early design phase of building facilities
b. During commissioning and hand over
c. During operations
d. At end of life of the facility
a. At early design phase of building facilities
Mention 3 of the 7 Winning Ways of Working.
Safety/Goal Zero, Compliance,
Integrated Delivery, Continuous Improvement,
Commercial Acumen, External Alignment,
Cost Ownership
Mention 5 of the 12 Life saving rules.
Valid work permit; Conduct gas tests; Verify Isolation; Confined space; over-riding SCE; Working at height; Suspended load; Smoking areas; No alcohol/drugs while working/driving; Do not use phones while driving; Use Seat belts; Journey mgt.
What is the Group Business Performance factor (BPF) as at Q3 2018?
a. 1.05 b. 1.24 c. 1.04 d. 1.14
c. 1.04
E&C - Do I need Line Manager approval to refuse G&H offered to me?
YES / NO
NO
Mention 4 of the Process Safety Fundamentals.
Double barriers for hydrocarbon vents & drains; Don't leave Open drains or critical transfer unattended; Take interim mitigation in case of failure of SCE; Follow procedures and sign-off each step for all critical activities; Walk the line; Don't make change without Proper MOC, Verify for tightness; Always check that equipment is pressure free and drained before mtce work; Perform MOC & install back flow protection; Respond to Critical Alarms;
The ______ makes all Improvement projects in SCiN visible across the whole organization
a) SharePoint
b) BI Portal
c) Wave
c) Wave
What is the new general emergency number?
a) 180 ,
b) 199
c) 222
d) 991
b) 199
What is the full meaning of the abbreviation - IPSC? a. Integrated Production System Centre
b. Initial Production System Capacity
c. Integrated Production System Capacity
d. Internet Problem Solving Contest
c. Integrated Production System Capacity
E&C - ______ condition should necessitate inclusion of ABC Clauses except:
A] New contract; B] Renegotiation of a contract not containing ABC clauses; C] 3 years has elapsed since the signing of original contract not containing ABC clauses; D] White flags have been discovered on the counter party.
D] White flags have been discovered on the counter party.
There is nothing like White Flags, the correct answer is Red Flags
Which of the following is not a KPI for Asset integrity?
a. Design Integrity b. Technical Integrity
c. Financial Integrity d. Operating Integrity
c. Financial Integrity
Mention 3 of 7 Game Changer Themes of OER
1. Wider Implementation of SBOs 2. Fast-Track High Impact Technologies 3. More Effective In/Outsourcing 4. Eliminate Value Eroding Practices 5. Reduce & High-Grade Infrastructure Footprint 6. More Efficient External Interfaces 7. Simplified Structure & Inspired People
Mention 3 of SCiN 7 Security Rules
1] Do not breach Access Control Procedures; 2] Wear a Valid SCiN Badge; 3] Comply with Visitor Procedures; 4] Comply with an Approved Security Plan ; 5] Comply with Clear Desk Policy/Safeguard Equipment; 6] Stay Alert ; 7] Observe & Report Security Incidents/Suspicious Activity
Mention 3 of the SCiN cost saving rules.
1] Start with Minimum Functional Specification; 2]Challenge Project specifications, Scope & Price. Establish “Should Cost” 3] Define projects and activities with ‘Cost’ as Key Value Driver; 4] Apply Lean Assurance, fit for project size or complexity; 5] Own your Activities, Projects and Contracts; 6]Work within Approved Budget; 7] Secure Approval before Commitment; 8]Think Cost in Naira; 9]Demobilize Idle Resources; 10] Use In-house Resources and Experience as Default; 11] Avoid Non-Value Add Exposure; 12] Always optimize and share resources
E&C - Existing contracts should be re-screened when they are renegotiated.
TRUE or FALSE
TRUE
A SoF is required in all but one of the following scenarios: a] Starting or commissioning a new asset b] Restarting an asset after a modification c] Restarting an asset which has been out of service d] Changing a bean box
d. Changing a bean box