Good Practices
Process
HECP
On Route
S.A.F.E.T.Y.
100

When to stretch

Before lifting items on route

100

5 min brake test

What is pump down, pump down, turn off, push and hold, pump down

100

What is step 2 of HECP

Notify affected employees

100

Proper container placement

Container placed off of street

100

Looking at around the truck at all times

See 3-6-9

200

Not sure of a clearance

G.O.A.L.

200

Tag, Call, Picture, Report

HOC process

200

Energy Sources

Gravity, Hydraulic, Electric

200

Making a complete stop at a stop sign

Stop behind white solid bar/sign for 3 seconds, 3-6-9

200

Find a safe space

300

Getting out and walking around after routine breaker is _____ the mind.

Resetting

300

Down time process in order

Identify, Control, Call shop, Dispatch, OM

300

How to verify energy isolation

Try to start the truck

300

Checking in at the completion of the route

1098 - phone dispatch - insert lift count (RYC)

300

What do we need to do while servicing cans

Think outside the cab

400

How to make sure intersection is clear before proceeding / clearing left side of truck before pulling off of stop

Look left-right-left

400

Fuel, Clean behind the blade, PTIL, Park

Arrive to yard

400

LCR#1

Isolate potential hazardous energy

400

When the ground is wet

Slow down, give more space to allow for longer stopping distance

400

Determine what other drivers might do

Evaluate other drivers

500

Look at the truck before heading to the dump or yard

Making sure the truck is in good condition to travel

500

Pull, Aim, Squeeze, Sweep 

PASS method for Fire Extinguisher

500

Can anyone do any HECP on any equipment?

No, only employees who have passed the correct DEMO back

500

Authorized breaks

30-minute lunch, 2–15-minute breaks after working for 1 hour on route

500

Advance your field of view

M
e
n
u