Who is the reponsible for protocol implementation into the Respiratory Software?
Study Implementation Manager
This document defines what was sold, what services are included, and the responsibilities of both Clario and the customer.
Work Order
This device is used to verify calibration performance of spirometry equipment
Calibration Check Syringe
Who do you contact internally to confirm the current version of the protocol?
Business Development
According to the Work Order, this person serves as the primary customer contact throughout the project.
Project Manager
This type of review has both a standard 48-hour turnaround and a 1-hour EXPRESS option
Spirometry OverRead
Sporometry guidelines that are being implemented in respiratory software are based on ______
ATS-ERS 2005 & 20019
This formal document is required when scope, cost, timelines, or services change after the Work Order is signed.
Change Order
These training sessions are included for experienced, intermediate, and novice users.
Virtual Training
What does SOA stand for?
Schedule of Activities
This is the number of countries participating in the study AP02-003.
8 countries
This is the estimated total Pass-Through Expense amount.
$85,700
Is a period of time set to exclude the influence of previously used treatments or drugs on the test result
Washout Criteria
This is the target Database Lock date in Protocol
AP02-003?
January 30, 2027
This is the total number of SpiroSphere Spirometry/ECG systems included.
77 devices