Projects + Plans Take 2
Grab your popcorn! Movies
Flippin' for Filters
Using DCC you + me
A little bit of everything
200

How does a subcontractor get listed on a project as a bidder?

The rep or customer needs to reach out to the Support Team to be added as a bidder. You can send a message to support@construction.com and be sure to include the Project Contract Number, Dodge Report #, Project Title and Company Name and information to be added. You can also visit: https://www.construction.com/dodge/submit-project.asp

200

What films feature the Jedi?

Star Wars

200

What is the maximum value you can filter by under "Valuation"

$500 million +

200

How do you receive a list of projects once a week on fridays?

When you create a saved search, you have a choice of when to send an email with the results:
• Never
• Daily
• Weekly on <choose day>

200

When you first login to DCC 2.0 for the first time and click on Projects  - what filter is automatically set?

Published: Last 90 Days

400

If a customer "follows" a project will they get email updates

Yes, the project updates are part of the daily "Dodge Project Lead News" email alerts. When followed project's version has changed or have documents added, then it will appear in the "Dodge Project Lead News" email.

400

Name the two stars of Titanic

Leonardo DiCaprio and Kate Winslet  

400

Under the Report Type Filter what are the 5 available options?

Project

Permit

ITEM

Blue Book ONETEAM

Project/Item Combo

400

How can I set up saved searches on behalf of my customer?

If you emulate the user, then you can set up a saved search on their behalf.

400

Can you add "Pre-Bid Meeting" as a column to sort/view on the Projects List page?

No. Pre-Bid meeting is not an available column. You can only use a filter and then you have to click into the project to see the pre-bid meeting date.

600

DAILY DOUBLE

Name the two states who outlawed pumping your own gas

600

Who directed ET, Jurassic Park, and Schindler’s List?

Steven Spielberg

600

On the filters how far back does the publish range go?

Last 4 years

600

What is the Tag (#) button used for in DCC 2.0?

A tag is a free-text label that users can add to a project or to a company. You can easily find projects that have had a tag applied. There are three options for tags: private, shared with company, or shared with specific users. By sharing a tag, you can draw attention to a specific project or company either to an individual or to the whole company. For example, a user can create a tag for "AngelinaWorkQueue" and share that tag with Angelina. Whenever the user finds a job that Angelina should look at, they can tag it with "AngelinaWorkQueue".  Angelina can define a search that looks for projects that have been tagged with that to see her work queue.

600

What does ITEM mean?

Information on Trades Equipment Material

ITEM – Projects that are not full projects but are related to information on trades, equipment, and/or materials. These projects are usually specified to a certain replacement or alternation

800

How can you email project from 2.0 like you can from 1.0

Currently, emailing projects are not available in 2.0.

800

What singer starred in the movie version of Selena?

Jennifer Lopez

800

Within the Bidding/Negotiating Action Stage, what are the available filters?

Bidding

GC Bidding

GC-Bidding Invitation

Sub Bidding

Negotiating

Bidding

800

What is the best way for a GC to utilize 2.0, please explain best practices.

To maximize the benefits of DCC 2.0, general contractors (GCs) should follow these best practices. First, set up saved searches tailored to the types of projects typically bid on, leveraging new search fields like pre-bid meeting dates. Use Quick View to swiftly review search results, accessing key project details without opening each project page. When a suitable project is found, tag and follow it. Tagging facilitates easy future searches and team collaboration, while following ensures updates appear in the user's newsfeed. Issue Invitations to Bid (ITBs) through OneTeam to efficiently connect with subcontractors in the Blue Book network. Additionally, GCs can perform company searches within the Blue Book network to find the right subcontractors for specific trades. Finally, utilize the Dodge Report (DR) for comprehensive access to all project-specific details, including plans, specs, and addenda, ensuring thorough preparation for bids. This structured approach enhances efficiency and project management.

800

What does "Focused" and "Other" mean, in the ITB Inbox?  

ITB rules are used to classify the ITBs as “Focused” or “Other” and are set in the Settings page.

“Focused” being ITBs the subcontractor is likely to bid on (ITBs I care about)

“Other” being ITBs the subcontractor is not likely to bid on

1000

What is the "Project by product" feature - is this 2.0's version of SpecAlerts?

Projects by product has a similar end goal to SpecAlerts, but does not rely on the searches defined up front by SpecAlerts. Instead, as the projects are automatically scraped by our internal software, that software finds keyword sequences that may specify a product. We manually associate those keywerd sequences with a manufacturer, which DCC 2 uses to show Projects by Product. SpecAlerts requires up-front work to define the searches that imply a DR has a reference to a product so it is more work to set up than Projects by Product, but it's also less reliable.

1000

What movie won Best Picture at the 74th Academy Awards in 2002 for the 2001 film?

A Beautiful Mind

1000

What division number is Earthwork?

Division 31

1000

DAILY DOUBLE!

How many times have the Olympics been hosted in Paris?

1000

How do you view a "ProView Profile" in DCC 2.0?

Search -> Companies -> Perform Search -> Click on Company Details -> Click on "Full Proview Profile"

M
e
n
u